
More excavation today. The kitchen foundation walls were wrapped with waterproofing and the perimeter drain installed. The floor joists were laid out for the kitchen and mud room. Demolition on the east chimney finished today; it’s down the foundation. I’m very impressed with way they’ve been very careful to remove and clean the bricks as its come down. It’ll be exciting to re-used all of the material later.